Wednesday, February 09, 2011

Orange barrels ahead....

This is the view from my car windshield as I waited to get through a light on Gay Street Bridge, a two lane bridge recently re-laned to three. Took me 4 lights to get through this stoplight.  A bicycle that pulled out of my neighborhood at the same time I did, beat me downtown.  Problem, the 3 year dismantle and reconstruction of the Henley Street Bridge.  Who would have thought Gay Street would become the main connector between south and everywhere else?  I did....but I keep forgetting.  

This is the view from my car windshield some 30 minutes later on Kingston Pike around Western Plaza, another major roadway, another major construction project, a five lane highway reduced to two.


I know these projects will eventually come to an end but until then, I need to remember go around them because going through them certainly makes for a frustrating afternoon!

0 comments:

  © Blogger template 'Solitude' by Ourblogtemplates.com 2008

Back to TOP